Rehabilitation Project for the Landfill Site Procurement Services
The rehabilitation of approximately 4 hectares of wild storage area is being carried out in accordance with environmental regulations, with the aim of eliminating environmental risks. As part of this work, analyses of the existing irregular storage conditions in the area have been conducted, and technical solutions to prevent the mixing of leachate with groundwater and surface water have been developed, along with plans to address environmental impacts such as odors, gases, soil, and water pollution that may arise in the area.
Within the scope of this project, our personnel have provided the following services:
Examination of the current condition of the wild storage site and conducting environmental risk analyses,
Evaluation of leachate formation, drainage structure, and the effects of groundwater,
Development of technical solutions to prevent the leachate from mixing with groundwater and surface water,
Determination of rehabilitation methods aimed at reducing the effects such as gas formation, odor, and soil pollution,
Preparation of technical planning regarding the closure and cover system of the storage site,
Creation of necessary engineering solutions to make the area compliant with environmental regulations after rehabilitation works,
Preparation of surveys, quantities, and technical documents,
Preparation and submission of reports essential for implementation to the employer.






