Mersin Metropolitan Municipality - Technical Report Service Procurement for the Construction and Operation of Integrated Waste Evaluation, Recycling and Disposal Facilities and Regular Storage Area
The project is a technical report service conducted to provide technical infrastructure for the preparation process of investments in Integrated Waste Evaluation, Recycling and Disposal Facilities and Regular Landfill Construction and Operation to be carried out by the Mersin Metropolitan Municipality. The study aims to carry out technical evaluations regarding the capacity, process structure, technological requirements, and operational models of the facilities, analyze the regular landfill from environmental, structural, and operational perspectives, and prepare a comprehensive technical report of all these evaluations to be submitted to the municipality.
Within the scope of this project, the following services have been provided by our personnel:
Evaluation of the current situation and needs regarding integrated waste management facilities, examination of technical documents, and analysis of field data.
Technical evaluation of capacity, process flows, and technology options for recycling, waste processing, disposal, and regular storage facilities.
Analysis of the structural requirements, environmental risks, and operating conditions of the regular storage area; defining appropriate design criteria.
Holistic technical evaluation of waste collection, transportation, separation, recovery, and disposal processes within the integrated system.
Preparation of all engineering analyses, calculations, and technical explanations required by the administration.
Preparation, organization, and delivery of a comprehensive technical report that will serve as the basis for municipal investments.





