io
English
io
English
io

Feasibility Study for the Kilis Organized Industrial Zone Wastewater Treatment Facility, Preparation of Tender Documents, and Creation of Detailed Design Projects

The project involves the preparation of detailed design projects for the "Kilis Organized Industrial Zone" wastewater treatment plant located in Kilis province. Within the scope of the designed wastewater treatment plant, the wastewater generated by the industries in the organized industrial zone will be treated, and it is also part of the project to submit the prepared projects for approval in accordance with the relevant regulations of the Ministry of Industry and Technology.

Description of the services provided by your personnel within the scope of the task:
• Preparation of Detailed Design Projects,
• Process Design Projects,
• Architectural Projects,
• Mechanical Installation Projects,
• Preparation of Infrastructure Projects and P&I Diagrams,
• Static and Reinforced Concrete Projects,
• Electrical and Automation Projects,
• Preparation of Tender Documents.

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2025

io Environmental Solutions Research and Development Ltd.

io Environmental Solutions Research and Development Ltd.

Contact

Istanbul

Ankara

Reşitpaşa Mah. Katar Cad. Arı Teknokent 1 2/5 D: 12 34469 Sarıyer

Phone: 0 (212) 276 65 48
Fax: 0 (212) 276 33 67
E-mail: info@iocevre.com

Copyright ©

2025

io Environmental Solutions Research and Development Ltd.