Feasibility Study for the Capacity Increase of Gaziantep Industrial Zone Wastewater Treatment Plant, Preparation of Tender Documents, Detailed Design and Drawings Creation
The main aim of this project was to increase the capacity of the Gaziantep Organized Industrial Zone Wastewater Treatment Plant by preserving existing units and to prepare tender documents for use by the management of the industrial zone. In this context, a feasibility report was prepared to determine the current condition of the existing WWTP and assess investment needs, and the most suitable technical solution was identified. The prepared report reveals the existing capacity of the GOİZ WWTP and includes the evaluation of various alternatives to meet the increasing demand. The feasibility report also includes conceptual design, hydraulic profile, P&I diagram, and architectural drawings. Following the feasibility report, detailed design projects and implementation drawings have been prepared. WWTP Capacity: 90,000 m³/day
Description of the services provided by your personnel within the scope of the task:
• Preparation of feasibility and process reports,
• Evaluation of treatment alternatives based on energy efficiency,
• Selection of the treatment process with low energy consumption,
• Conducting hydraulic design,
• Preparation of technical specifications,
• Preparation of Technical Specification (Terms of Reference) for the construction phase,
• Preparation of design and detailed drawings (Architectural, Mechanical, Electrical, Construction),
• Preparation of cost estimates and bill of quantities,
• Increasing the employer's awareness and knowledge on low energy consumption and energy efficiency.