DÖHLER Karaman Factory Sustainable Water and Wastewater Management Plan Preparation Project
The project will be carried out at DÖHLER's production facility in Karaman to enhance water efficiency, manage water resources sustainably, and create an environmentally friendly production infrastructure by reducing wastewater formation. As part of the study, the factory's current water consumption, process-based water use, the amount of wastewater generated, and pollution loads have been analyzed in detail; recovery, reuse, and water conservation potentials will be evaluated. A comprehensive Sustainable Water and Wastewater Management Plan has been prepared that includes short, medium, and long-term targets for the facility; process improvements, technological investments, and infrastructure development steps will be determined.
Within this project, the following services will be provided by our personnel:
Analysis of the factory's current water consumption, process-based usage, and loss–leakage situation,
Assessment of wastewater generation, pollution parameters, and treatment needs,
Investigation of water conservation, process optimization, recovery (e.g., MBR, RO, etc. technologies), and reuse options,
Determination of short, medium, and long-term strategies for sustainable water management of the facility,
Identification of investment needs, equipment requirements, and areas for improvement for water and wastewater infrastructure,
Calculation of economic analyses, operating costs, and return times,
Evaluation of water footprint and sustainability indicators,
Preparation of the Management Plan document and presentation of technical reports to the employer.







