Çolaklı Wastewater Treatment Plant Project Preparation Work Project
This project encompasses the preparation of all engineering and technical documentation for the Çolaklı Wastewater Treatment Plant, which is planned with a capacity of 150,000 m³/day according to the 2050 population projection. The project includes the feasibility reports, process reports, and hydraulic profile of the facility; designs have been developed for all units of the facility including Pre-Treatment, Pre-Settling Basin, Anaerobic Basin, Aeration Basin, Final Settling Basins, Sludge Dewatering Unit, Blower Building, Discharge Structure, and Filtration Unit. Additionally, architectural, construction, mechanical, and electrical detailed designs for the pumping stations and lift lines have been prepared; final tender documents consisting of technical specifications, unit price schedules, unit price lists, location lists, and analyses have been created.
Within the scope of this project, the following services have been provided by our staff:
· Preparation of population and flow projections for the year 2050,
· Creation of feasibility and process reports suitable for facility capacity,
· Design of treatment processes and hydraulic profiles,
· Preparation of architectural, construction, mechanical, and electrical projects related to Pre-Treatment, Pre-Settling, Anaerobic, Aeration, Final Settling, Sludge Dewatering, Blower, Filtration, and Discharge units,
· Project designs for booster lines and booster pump stations,
· Preparation of technical specifications, unit price schedules, unit price tables, neighborhood lists, and analyses,
· Coordinated completion of project reports, technical drawings, and tender documents.