Drinking Water Supply Project Construction from Uşak Sorkun Pond
This project involves preparing engineering studies aimed at supplying the drinking and utility water needs of the Uşak province and its surroundings by purifying the water sourced from Sorkun Pond and delivering it to the settlements. Within the scope of the study, the water potential and quality of the pond will be evaluated; necessary purification processes, transmission lines, storage tanks, and pumping stations will be technically designed. Additionally, the long-term operating conditions of the water supply system, hydraulic calculations, route determination studies, and the capacity requirements of the system components will be analyzed to ensure the project planning of the drinking water supply infrastructure.
In this project, the following services will be provided by our personnel:
Assessment of the water potential, flow rate, and water quality of Sorkun Pond,
Preparation of drinking water demand projections and determination of necessary capacity,
Development of process design and necessary technical components for the drinking water treatment facility,
Determination of the route for the transmission line, hydraulic calculations, and selection of pipe diameter/type,
Design of capacities and equipment for booster stations, reservoirs, and auxiliary infrastructure units,
Preparation of plans, profiles, sections, and other technical drawings related to the project,
Preparation of quantity take-offs and feasibility studies, and conducting project cost analyses,
Preparation of essential technical reports for implementation and submission to the employer.