Terme, Çarşamba, Salıpazarı, Ayvacık Drinking Water Facilities Project Construction Work
The project involves the distribution of 25.74 hm³/year of water from the Salıpazarı Dam, located within the borders of Samsun province, to the treatment facility for the purpose of drinking water supply, and the transmission of the treated water to the districts of Salıpazarı, Çarşamba, and Terme also located within the borders of Samsun province, along with the necessary transmission lines, treatment facility, and related infrastructure projects. Within the scope of the project, the raw water transmission line from the dam to the treatment facility, as well as the transmission and network lines for distributing the treated water, water reservoirs, pumping stations, and treatment facility process units have been designed.
Within the scope of this project, our personnel has prepared hydraulic route determination studies, capacity and process design of the treatment plant, engineering projects for the transmission and distribution networks, and designs for the storage and pumping stations.
Additionally, active roles have been taken in the processes of hydraulic calculations, topographic analyses, field studies, measurement and exploration studies, preparation of project reports, and creation of technical documentation.
During the project, our personnel contributed to the development of sustainable solutions to meet the long-term drinking water needs of Samsun province and its districts by conducting field studies, engineering analyses, drawing and reporting activities.