Home
About Us
Services
Projects
HR
Contact
Baku-Tbilisi-Ceyhan (BTC) Oil Pipeline Oil Pollution Control
BOTAŞ - Consultancy Service for the BTC Oil Pipeline Route: Post-Accident Phase 4 Hydrogeological Monitoring, Data Collection, Pollution Inspection, Conceptual Site Model Study, and Cleaning Activities Around the BVT16 Valve
Consulting Services for the Revision and Development of Preliminary Feasibility Studies and the Conduct of Environmental and Social Screening Studies (Group-1)
Industrial Water Use Efficiency Project According to NACE Codes
Design of Rainwater Drainage and Oil Waste Networks at TÜPRAŞ Batman Refinery
Design of Rainwater Drainage and Oil Waste Networks at TÜPRAŞ Izmit Refinery