Aydın Drinking Water Treatment Plant Stage 2 Construction Project
The project covers the project development services of the existing Drinking Water Treatment Plant supplying drinking and utility water to the province of Aydın, which is planned to meet the increasing population and water needs with the establishment of the 2nd Stage Drinking Water Treatment Plant. Within the scope of the project, the capacity status of the existing facility has been evaluated; engineering projects aimed at expanding the facility in a way that can meet long-term needs, along with additional treatment units, have been prepared. In this context, design principles related to drinking water treatment processes have been determined, and implementation projects for all structural and technical components of the facility have been developed.
Within the scope of this project, the following services have been provided by our staff:
Reviewing the capacity, process performance, and operational data of the Existing Aydın Drinking Water Treatment Plant,
Determining the need for a 2nd stage facility and its design capacity in accordance with the increasing drinking water demand,
Establishing design criteria for drinking water treatment processes,
Preparing process flow diagrams and hydraulic profiles for the 2nd stage drinking water treatment facility,
Preparing architectural, reinforced concrete, mechanical, and electrical application projects related to the facility units,
Technically determining the chemical dosing systems, equipment selection, and energy requirements,
Creating facility layout plans and infrastructure arrangements,
Preparing technical reports, calculations, and drawings related to the project in accordance with DSİ standards,
Submitting the prepared projects to the administration and providing necessary technical explanations during the evaluation process.