Wastewater and Stormwater Sewerage Network Project

This project was carried out on the Büyükdere Asphalt Road in Şişli District of Istanbul Province. The project consists of the preparation and implementation of the wastewater and stormwater sewerage network projects of the Istanbul Tower 205 Levent Office Project.

Type of Services Provided:

• Determination of population in the project area and determination of wastewater flow rates and end flow points according to ISKI Technical Specifications.
• Determination of stormwater basins and flow coefficients in the project area and determination of rainwater flow rates according to ISKI Technical Specifications.
• Determining the most suitable routes for wastewater and stormwater sewerage by considering mechanical project connections and preparation of application projects.
• Carrying out market research in terms of ease of construction and cost related to materials and equipment planned to be used within the scope of the project.
• Preparation of the current discovery report to be used in tender works for the construction of wastewater and stormwater sewer lines in the project area.