Preparation of Price System and Account Tool for Discharge of Sewage System of Bursa Organized Industrial Zone to Sewerage Network

Bursa Organized Industrial Zone An account tool program has been prepared to revise the discharge standards to the sewerage network, to create the most appropriate tariff system to be used in the accrual of the costs and to implement these standards and tariff system correctly. In addition, an inspection system has been designed to make this system sustainable. Within the scope of the project, technical specifications of the investments required for existing wastewater treatment plants and water production plant rehabilitation have been prepared.

These documents have been prepared:

  • Data collecting
  • Preparation of Feasibility Report
  • Preparation of Software Program
  • Preparation of Technical Specification