Revision of IPA Application Form and Çorum Solid Waste Management Project
In project scope; the field visits of waste management and the pre-evaluation of 21 wild storage areas to be rehabilitated; and revision of the design report, revision of the IPA Application Form and the Non-Technical Summary of the EIA Report, revision of the technical drawings, preparation of General and Specific Technical Specifications for the work in accordance with FIDIC Red Book requirements.
- Design Report revision
- Feasibility Report revision
- Scout Metering update
- IPA Application Form revision
- Revision of the EIA Non-Technical Summary
- Revision of Project Drawings
- Preparation of General and Special Technical Specifications for Construction Work (FIDIC Red Book)